Accommodation

Detailed planning consent has been granted.
The detached steel portal framed unit will be delivered to a high quality with first floor offices to the front elevation.

Warehouse52,610 sq ft4,888 sq m
First floor offices 2,965 sq ft 275 sq m
Total55,575 sq ft 5,163 sq m
Masterplan image
10m clear internal height

10m clear internal height

4 dock levellers including 1 euro dock leveller

4 dock levellers including 1 euro dock leveller

2 level access loading doors

2 level access loading doors

50m yard depth

50m yard depth

First floor offices

First floor offices

Provision for Electric Vehicle charging points

Provision for Electric Vehicle charging points

Gated secure yard/self contained site

Gated secure yard/self contained site

50 kN sq m

50 kN sq m

500 KVA power supply (Ability to upgrade to 2.5 MVA)

500 KVA power supply (Ability to upgrade to 2.5 MVA)

Upgraded roof structure to support additional PV cells

Upgraded roof structure to support additional PV cells

45 car parking spaces

45 car parking spaces

Outdoor breakout space

Outdoor breakout space

EPC

To be built to an EPC ‘A’ Rating

Uses

The new facility has planning consent for B1c, B2 & B8 uses.

Occupier Welfare

Barberry55 has been designed with employee welfare at the forefront of the development, providing an exceptional environment in which to work.

£3k developer contribution to gym equipment

£3k developer contribution to gym equipment

Outdoor breakout space

Outdoor breakout space

Natural and mechanical ventilation

Natural and mechanical ventilation